Decoration design experience

2018-03-08 01:36:00

Judao engineering design limited decoration "ten steps standardized construction". Judao Engineering Design Limited is formed by a creative design and construction team, dedicated to China's modern interior design and construction work. The concept is "interactive custom design, visible and assured decoration". According to the specific conditions of each customer, family structure and personality characteristics of individual custom design, with the original spirit of each unit to create a unique personalized design boutique. At the same time, Judao strictly controls the entire construction progress and controls every process detail, is committed to the continuous innovation of construction technology, formulates the construction standards ahead of the industry, and ensures the quality requirements of each project. Judao Engineering Design Limited is formed by a creative design and construction team, dedicated to China's modern interior design and construction work. The concept is "interactive custom design, visible and assured decoration". According to the specific conditions of each customer, family structure and personality characteristics of individual custom design, with the original spirit of each unit to create a unique personalized design boutique. At the same time, Judao strictly controls the entire construction progress and controls every process detail, is committed to the continuous innovation of construction technology, formulates the construction standards ahead of the industry, and ensures the quality requirements of each project.

Tools/Materials
1

Interactive custom design

2

Can see the rest assured decoration

Methods/Steps
1

1. On-site handover: (1) on-site handover and acceptance; (2) Submit construction drawings and instructions; (3) Property management handover procedures. 2. Pay-off work shall be carried out according to the design drawings and the demolition and renovation plan determined by the owner in advance as well as the construction technology. 3, the demolition work according to the design ideas and use needs of the house non-load-bearing fill wall partial demolition and line and end point displacement.

2

Water and electricity engineering 1, trough 2, layout 3, threading 4, acceptance according to the construction drawings, construction technical disclosure, construction specifications and quality acceptance standards for wiring, wiring should be conducted after the completion of the construction work, water supply pressure test, drainage test and electrical inspection and acceptance work.

3

1. Concealed acceptance Acceptance of concealed works refers to the inspection of the quality of concealed works closed on the decorative surface layer after the completion of the line works and the construction works of the decoration nodes hidden inside the decorative surface layer. 2, leveling the floor of the removed and cleaned interior wall is further leveled, and the pit and brick stubble are filled with mortar after removal. 3, waterproof cleaning structure base and repair base, leakage weak links first repair and local strengthening of waterproof (such as water, electric slot, wall roots, roots, door and other parts of the local strengthening of waterproof), large area waterproof construction, 48 hours closed water test inspection, waterproof mortar protective layer construction, finished product protection.

4

Wood engineering Wood engineering mainly includes ceiling ceiling, door and window set base, wall decoration base, background wall base, wood floor base, cabinet base, curtain box, skirting line, handrail, flower decoration and other details of the base carpentry construction operations. Wooden base construction should be concealed inspection, inspection can be carried out decorative surface construction.

5

Paving construction mainly includes: cement mortar screed layer construction, wall tile, stone, Mosaic and other construction. The construction team shall carry out the construction work in strict accordance with the design drawing and practice description, quality acceptance standard, construction technology disclosure and technological process. Incoming materials (such as wall tiles, stone, mosaics, etc.) should be accepted.

6

Kitchen construction mainly includes cabinet construction and door panel installation.

7

Oil works Oil works mainly include wall paint and wood paint two kinds. Wall paint construction includes putty full scraping and grinding, wall paint oil coating and grinding, requiring one bottom and two sides; Wood paint construction mainly includes wood grinding and oil coating.

8

The construction of wood flooring mainly includes: solid wood flooring, composite wood flooring, multilayer wood flooring, bamboo flooring, wooden skirting line and so on. These decorative surfaces and wood floors are manufactured, processed into semi-finished products or finished products, and transported to the site for assembly.

9

Installation projects mainly include: kitchen cabinets, bathroom sanitary ware, household appliances, door and window fans, clothing cabinets, storage cabinets, switch socket panels, exhaust fans, lamps and hardware, faucets, shower and other installation projects. After the installation project is completed, glue shall be applied in accordance with the closing part specified in the construction technical disclosure. After the self-inspection of various installation projects is qualified, the finished product protection work should be done.

10

After the completion of the construction of the solid installation project, some garbage and dirt are often left behind, and cement contamination points, paint, glass glue, water stains, rust and so on will be left on the ground and walls, which must be cleaned in the cleaning work. Protection of finished products after clearing and cleaning. The content of acceptance mainly includes: acceptance of all aspects such as perception quality, safety and function. The basis of acceptance mainly includes: national, industry, local quality acceptance standards, enterprise standards, construction drawings and design change drawings, practice instructions. At this point, the project warranty period or after-sales service period (warranty service: decoration insurance for one year, water and electricity insurance for three years).